{"id":3323,"date":"2026-09-16T20:03:23","date_gmt":"2026-09-16T20:03:23","guid":{"rendered":"https:\/\/beltalabs.com\/shanks\/?p=3323"},"modified":"2026-09-16T20:03:23","modified_gmt":"2026-09-16T20:03:23","slug":"lakepointe-church-rockwall-advice","status":"publish","type":"post","link":"https:\/\/beltalabs.com\/shanks\/2026\/09\/16\/lakepointe-church-rockwall-advice\/","title":{"rendered":"Lakepointe Church Rockwall Advice"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Before a Facilities Upgrade or New Development: 3 Insights&nbsp;and 1 Industry Tip&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There are 3 critical steps to make the proverbial magic happen&nbsp;for&nbsp;a superior and cost-effective new development or facilities upgrade.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">I started by asking two professionals, one&nbsp;Pastor of&nbsp;Operations and one&nbsp;Interior Designer,&nbsp;for some direct&nbsp;advice for Pastors embarking on a remodel or new church build. Three concepts&nbsp;emerged&nbsp;from our conversations.&nbsp;I then sought out an industry recommendation from a seasoned church Architect.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">I first spoke with Interior Designer Katherine Wiley. She has 15+ years of experience working at church, library, and school centered firms. Given her experience, I asked what would be helpful for the team on the other side of the table to know?&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">She recalled working on an extension project for&nbsp;<a href=\"https:\/\/lakepointe.church\/rockwall\/\" target=\"_blank\" rel=\"noopener\">Lake Pointe Church<\/a>&nbsp;in Rockwall,&nbsp;TX as&nbsp;a&nbsp;stand out&nbsp;experience of efficacy in a project. \u201cThey knew what they&nbsp;wanted,&nbsp;they knew who would be utilizing the space, and they knew what to express.\u201d,&nbsp;Wiley said. They pre-collaborated to get a unified vision, which is something she says that churches struggle with a lot. In this case, she was working with three people: a Designer from the church, the&nbsp;Operations&nbsp;Pastor, and their Contractor.&nbsp;They had their goals&nbsp;aligned&nbsp;which made the selection process go quickly. Timing was also very efficient because they had a solid contractor on the design team from the beginning.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">She recommends that churches work together to prepare a unified vision ahead of time.&nbsp;Then entrust a small team to move forward with the project. Have a reputable contractor in place early to forecast building costs as the design develops and to execute a faster quality construction.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Since this was such a standout project in Katherine\u2019s experience, I decided to follow up with the Pastor of Operations at Lake Pointe Church Rockwall,&nbsp;Pastor&nbsp;John Wardell. Pastor Wardell has been the Manager of Operations for Lake Pointe Church for over 35 years, predating&nbsp;the&nbsp;Rockwall Campus. He is a highly experienced Operations Pastor and familiar with the process Lake Pointe Church used in building new campuses, renovations, and extensions.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">I asked Wardell what he recommends for Pastors and Church Boards to consider as they plan their new buildings or upgrades. He&nbsp;advised&nbsp;against having too many people in either the design or the decision-making process. \u201cTheir projects often go undone because too many people are trying to guide the process.\u201d He cautioned that there is a long history of churches relying on committees who are unable to make decisions. He also added: \u201cOnce you have landed on your design, involve your builder or a construction consultant early in the process to value engineer the building to maximize your resources.\u201d&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Wiley and Wardell independently&nbsp;provided&nbsp;the same counsel:&nbsp;<\/p>\n\n\n\n<ol start=\"1\" class=\"wp-block-list\">\n<li>Prepare a unified vision first\u00a0<\/li>\n<\/ol>\n\n\n\n<ol start=\"2\" class=\"wp-block-list\">\n<li>Whittle down your team to the absolute minimum\u00a0<\/li>\n<\/ol>\n\n\n\n<ol start=\"3\" class=\"wp-block-list\">\n<li>Hire a Contractor early to work collaboratively with your Architect\u00a0<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">I asked David Shanks, Principal Architect&nbsp;and&nbsp;President&nbsp;of church focused firms for over 30 years, if he had&nbsp;industry&nbsp;recommendations for any of these 3 steps. His&nbsp;recommendation is&nbsp;to seek out an&nbsp;&nbsp;<br>Architect-led&nbsp;program during the&nbsp;very&nbsp;early&nbsp;preparation phase.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Shanks confirmed that \u201cIt is at that early collaborative&nbsp;phase&nbsp;of creating a unified vision that an architect-led program can provide value to that process.\u201d&nbsp;He explained that&nbsp;it&nbsp;is a&nbsp;scope&nbsp;identifying&nbsp;activity.&nbsp;It&nbsp;seeks out all the problems to solve long before&nbsp;beginning the design of a project and incurring&nbsp;serious&nbsp;costs and time.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An architect-led&nbsp;program identifies&nbsp;the true statement of need and estimates&nbsp;the cost.&nbsp;This helps the committee discover their budget, clarify the vision within that budget, and&nbsp;determine&nbsp;the true scope of the&nbsp;desired&nbsp;project.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">By&nbsp;<a href=\"http:\/\/shanksarchitects.com\/people_detail\/heather-wiley\/\" target=\"_blank\" rel=\"noopener\">Heather Wiley<\/a>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Associate at&nbsp;<a href=\"http:\/\/shanksarchitects.com\/\" target=\"_blank\" rel=\"noopener\">Shanks Architects<\/a>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Before a Facilities Upgrade or New Development: 3 Insights&nbsp;and 1 Industry Tip&nbsp; There are 3 critical steps to make the proverbial magic happen&nbsp;for&nbsp;a superior and cost-effective new development or facilities upgrade.&nbsp;&nbsp; I started by asking two professionals, one&nbsp;Pastor of&nbsp;Operations and one&nbsp;Interior Designer,&nbsp;for some direct&nbsp;advice for Pastors embarking on a remodel or new church build. Three [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":2670,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"postBodyCss":"","postBodyMargin":[],"postBodyPadding":[],"postBodyBackground":{"backgroundType":"classic","gradient":""},"footnotes":""},"categories":[13],"tags":[9,27,36,30,15,29,31,34],"class_list":["post-3323","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-memorial-funeral-architecture","tag-adaptive-reuse","tag-city-studio","tag-civic-identity","tag-community-anchor-design","tag-memorial-architecture","tag-public-space-design","tag-shade-and-walkability","tag-urban-planning"],"_links":{"self":[{"href":"https:\/\/beltalabs.com\/shanks\/wp-json\/wp\/v2\/posts\/3323","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/beltalabs.com\/shanks\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/beltalabs.com\/shanks\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/beltalabs.com\/shanks\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/beltalabs.com\/shanks\/wp-json\/wp\/v2\/comments?post=3323"}],"version-history":[{"count":1,"href":"https:\/\/beltalabs.com\/shanks\/wp-json\/wp\/v2\/posts\/3323\/revisions"}],"predecessor-version":[{"id":3324,"href":"https:\/\/beltalabs.com\/shanks\/wp-json\/wp\/v2\/posts\/3323\/revisions\/3324"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/beltalabs.com\/shanks\/wp-json\/wp\/v2\/media\/2670"}],"wp:attachment":[{"href":"https:\/\/beltalabs.com\/shanks\/wp-json\/wp\/v2\/media?parent=3323"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/beltalabs.com\/shanks\/wp-json\/wp\/v2\/categories?post=3323"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/beltalabs.com\/shanks\/wp-json\/wp\/v2\/tags?post=3323"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}